Phase 2 Sanitary Sewer System Improvements

Project Name:
     Phase 2 Sanitary Sewer System Improvements

General Area:
     City-wide


Project Description:
Through an inspection process, it has been determined that the sanitary and storm sewer several areas of the City of Oskaloosa has begun to fail, causing high inflow and infiltration.  The phase 2 project is the second of several projects that have been planned in order to provide effective and reliable sanitary and storm sewer service to residents. The project includes sewer pipe reconstruction (approximately 2,600 LF), sewer pipe lining (approximately 9,800 LF), manhole reconstruction (15 manholes), manhole rehabilitation (approximately 330 LF), and manhole invert repairs (33 manholes). The preliminary plans for the project can be viewed below:

Project Plans


Project Locations:

Work will be performed in various locations throughout the city. View the location maps below for detailed locations for projects.

Location Map 1
Location Map 2
Location Map 3

Project Benefits:
Residents currently using sanitary and storm sewer services in these areas will benefit directly as a result of this project.  This project will also reduce the inflow and infiltration of excess water into wastewater treatment facilities, which will reduce long-term operating and maintenance costs.

Project Status:
Currently, all spot repairs on this project have been completed, and the contractor is continuing to work on replacing manholes. The work to clean and line the sanitary sewer pipes is also currently in progress. Areas which require full replacement sanitary sewer replacement work have not yet begun construction and are planned to begin work in September.

The City Council awarded the contracts for this project at their meeting on April 16, 2018.  The construction is divided into two divisions.  Division 1 of the project includes primarily sanitary sewer replacement work, and was awarded to TK Concrete, Inc. in a total contract amount of $899,286.00. Division 2 includes primarily sanitary sewer rehabilitation projects, and was awarded to Visu-Sewer, Inc. in a total contract amount of $1,275,886.60. Construction begin in May, and has been allotted 100 working days for division 1 and 125 working days for division 2.

Project Cost:
Sanitary Sewer Reconstruction:                             $899,286.00
Sanitary Sewer Rehabilitation  :                          $1,275,886.60
Total Estimated Construction Cost:                $2,175,172.60  
                           

Construction Start Date:
05/01/2018
Construction End Date:
12/14/2018

 

If you have any questions about this project, please contact the Public Works Department at (641) 673-7472.