Project Description

Through an inspection process, it has been determined that the sanitary and storm sewer several areas of the City of Oskaloosa has begun to fail, causing high inflow and infiltration. The phase 2 project was the second of several projects that have been planned in order to provide effective and reliable sanitary and storm sewer service to residents. The project includes sewer pipe reconstruction (approximately 2,600 LF), sewer pipe lining (approximately 9,800 LF), manhole reconstruction (15 manholes), manhole rehabilitation (approximately 330 LF), and manhole invert repairs (33 manholes). The preliminary plans for the project can be viewed below: Project Plans (PDF)

Project Locations: 

Work was performed in various locations throughout the city. View the location maps below for detailed locations for projects.

Location Map 1 (PDF)
Location Map 2 (PDF)
Location Map 3 (PDF)

Project Benefits

Residents currently using sanitary and storm sewer services in these areas benefit directly as a result of this project. This project also reduced the inflow and infiltration of excess water into wastewater treatment facilities, which will reduce long-term operating and maintenance costs.


Project Status:

 This project was completed in May and the City Council accepted completion in October 2019.

The City Council awarded the contracts for this project at their meeting on April 16, 2018. The construction was divided into two divisions. Division 1 of the project includes primarily sanitary sewer replacement work, and was awarded to TK Concrete, Inc. in a total contract amount of $899,286.00. Division 2 included primarily sanitary sewer rehabilitation projects, and was completed by Visu-Sewer, Inc. in a total contract amount of $1,137,418.05. 

Project Cost

Sanitary Sewer Reconstruction: $932,422.90 (Final Contract Amount)
Sanitary Sewer Rehabilitation : $1,137,418.55 (Final Contract Amount)
Total Construction Cost: $2,069,841.45

Construction Start Date

05/01/2018

Construction End Date

9/30/2019

If you have any questions about this project, please contact the Public Works Department at (641) 673-7472.